7.7-acre parcel · ~7.5 AC cleared pad · Block 453, Lot 1.02
Open for data center development · Power-adjacent land
600 Aloe
Street
Galloway Township · Atlantic County, New Jersey
- 7.7 AC · 7.5 AC cleared
- Adjacent ACE substation
- 11 MW → 37 MW
- Fiber in corridor
- Natural gas
Concept render, illustrative only.
01 — Site at a glance
Cleared, connected, and utility-adjacent
Indicated capacity from the adjacent ACE substation
Potential with transformer upgrades
Atlantic City Electric distribution service
Sprint / Cogent and Uniti routes identified nearby
South Jersey Gas infrastructure at the street
Concept plan showing developability · not a final data-center design
To Atlantic City International Airport & FAA Tech Center
Why this site
- Power is the constraint on every data center project — this site sits directly across the street from an existing Atlantic City Electric substation.
- Carrier fiber routes (Sprint / Cogent, Uniti) are mapped in the area.
- Pad is cleared and graded; Pinelands Regional Growth Area with industrial use permitted.
- South Jersey Gas at the street, with public water and sewer in the area.
02 — Power · Atlantic City Electric
Adjacent substation — the site's defining advantage
Capacity
- Utility: Atlantic City Electric (Exelon) — 13.2 kV distribution service.
- Existing substation directly across Prague Avenue.
- Concept plan reserves a screened pad for 12 natural-gas generator units (~9 MW).
03 — Site aerial · Infrastructure markout
Property, substation, and fiber route
Toggle each layer to see how the parcel, power, and fiber relate. Hover or tap a layer for detail.
Infrastructure markouts are approximate and illustrative only — not a survey.
04 — Connectivity · Gas · Water
Utilities at the street
Fiber optic
Sprint / Cogent · Uniti
- Sprint / Cogent route mapped along the Prague Avenue frontage.
- Cogent is a Tier-1 IP backbone; Sprint's wireline network is now part of Cogent.
- A Uniti fiber network has been identified in proximity to the site — supporting a potential diverse, multi-carrier path.
Natural gas
South Jersey Gas
- South Jersey Gas infrastructure on the frontage; concept plan shows a gas line to the generator pad.
- Gas-fired backup, prime, or bridge power is contemplated.
- 12-unit generator area (~9 MW) shown on the concept site plan.
Water & sewer
Atlantic City MUA
- Public water and sanitary sewer in the area.
- Cooling design (evaporative or hybrid) will depend on available water capacity.
- Stormwater: underground detention per NJDEP rules on the concept plan.
Utility summary
- Electric
- Atlantic City Electric — 13.2 kV
- Gas
- South Jersey Gas
- Fiber
- Sprint / Cogent · Uniti
05 — Concept development plan
100,000 SF concept — illustrative, not a final design
Concept site data
- Site area
- 7.7 AC parcel · 7.50 AC cleared
- Building area
- 100,000 SF
- Building height
- 40' clear
- Finished floor
- FFE 55.0
- Loading docks
- 12 dock doors · 12 trailer spaces
- Parking
- 84 spaces (2 ADA · 2 EV)
- Generator area
- 12 units · ~9 MW · natural gas · screened
- Electric service
- 13.2 kV underground · pad-mount substation
- Zoning
- Industrial / distribution use permitted
- Rail
- Preserved ACNR rail line on site
Concept only. The 100,000 SF plan demonstrates site developability — it is not the proposed final data-center design. The building can be re-planned as a purpose-built data center within the same footprint. Existing industrial approvals are not a data-center entitlement.
Concept utility plan · service entries
- Electric13.2 kV underground to building; pad-mount substation on the east side.
- Natural gasSouth Jersey Gas service to the generator pad.
- Fiber opticSprint / Cogent or Uniti lateral from the street to a building MPOE.
- Water / fireDomestic and fire service; hydrants on loop road.
- Sanitary sewerConnection at the south side of the site.
06 — Entitlements & site readiness
Zoned industrial in a Pinelands Regional Growth Area
- Pinelands Regional Growth Area — Galloway WHP-Tilton zoning district; industrial / distribution use permitted.
- White Horse Pike Corridor Redevelopment Plan (Phase I) area.
- Pad cleared and graded; wetlands and buffers delineated (Endicott Engineering, June 2026).
- Prior Pinelands Certificate of Filing on record for the parcel (Block 453, Lots 1.01 & 1.02).
- Concept civil package prepared: site plan, stormwater, utility plan, landscaping, compliance.
- Existing industrial approvals are not a data-center entitlement.
- Ownership: RGC 4, LLC — single-owner, clean transaction.
Concept view from Aloe Street — 100,000 SF industrial shell (illustrative)
07 — Location & access
Airport, FAA, university, and hospital anchors within minutes
Drive distances
- 2 miACY Airport & FAA Tech Center
- ~3 miAtlantiCare RMC — Mainland
- ~4 miStockton University
- 12 miAtlantic City
- ~50 miPhiladelphia
- ~125 miNew York City
Stockton University opportunity
Ownership has identified Stockton University (4 mi) as a potential workforce and academic relationship — recruiting, student internships, and a talent pipeline for a future operator. No agreement is in place.
Hospital & health networks in range
AtlantiCare (Mainland — Pomona, 3 mi; Atlantic City campus) · Shore Medical Center (Somers Point) · Inspira Health (Vineland) · Virtua Health, Jefferson Health NJ, Cooper University Health Care (Camden County corridor).


08 — Next steps
Materials & process
Materials & process
- Site, survey, and engineering materials — including the Endicott concept civil package — are available to qualified parties under a mutual NDA.
09 — Inquire
Start a conversation about 600 Aloe Street
Request the offering package, the mutual NDA, or a site visit. Inquiries go directly to ownership.